Shires Extra Long Lead Rope

Regular price £7.20
Description

The Shires Extra Long Lead Rope is a 3m lead rope fitted with a brass swivel trigger clip, available in a wide choice of colours.

  • Length: 3m
  • Brass swivel trigger clip
  • Available in Black, Green, Navy Blue, Orange, Pink, Purple, Red, and Sky Blue

Colour: Black, Green, Navy Blue, Orange, Pink, Purple, Red, Sky Blue
Size: One Size

Browse our full range of headcollars and leads or explore the complete Shires Equestrian range.

Specifications
Brand Shires
Length 3m
Clip Type Brass swivel trigger clip
Colours Available Black, Green, Navy Blue, Orange, Pink, Purple, Red, Sky Blue
Size Range One Size
Frequently Asked Questions
How long is the Shires Extra Long Lead Rope?
The Shires Extra Long Lead Rope measures 3m in length.
What type of clip does this lead rope have?
It features a brass swivel trigger clip.
What colours is the Shires Extra Long Lead Rope available in?
It is available in Black, Green, Navy Blue, Orange, Pink, Purple, Red, and Sky Blue.
SKU: 25460SP1742701