Shires Extra Long Lead Rope
Regular price
£7.20
Description
The Shires Extra Long Lead Rope is a 3m lead rope fitted with a brass swivel trigger clip, available in a wide choice of colours.
- Length: 3m
- Brass swivel trigger clip
- Available in Black, Green, Navy Blue, Orange, Pink, Purple, Red, and Sky Blue
Colour: Black, Green, Navy Blue, Orange, Pink, Purple, Red, Sky Blue
Size: One Size
Browse our full range of headcollars and leads or explore the complete Shires Equestrian range.
Specifications
| Brand | Shires |
|---|---|
| Length | 3m |
| Clip Type | Brass swivel trigger clip |
| Colours Available | Black, Green, Navy Blue, Orange, Pink, Purple, Red, Sky Blue |
| Size Range | One Size |
Frequently Asked Questions
How long is the Shires Extra Long Lead Rope?
The Shires Extra Long Lead Rope measures 3m in length.
What type of clip does this lead rope have?
It features a brass swivel trigger clip.
What colours is the Shires Extra Long Lead Rope available in?
It is available in Black, Green, Navy Blue, Orange, Pink, Purple, Red, and Sky Blue.
SKU: 25460SP440BLKCHRY
Shires Extra Long Lead Rope


















